LedgerLine uses CSI MasterFormat-style cost codes — the standard classification system the US construction industry uses to organize costs by trade. Each code follows a Division-Section format, e.g. 06-100 for rough framing under Division 06 (Wood, Plastics & Composites). The section number after the dash is up to your team — use it to distinguish multiple line items within the same trade (e.g. 06-100 for framing lumber vs. 06-200 for finish carpentry).
01General Requirements
Project management, permits, temporary facilities, general conditions.
02Sitework / Existing Conditions
Demolition, clearing, grading, excavation, utility hookups. (Many teams keep site prep here rather than the newer 31-33 range — either works as long as your team is consistent.)
03Concrete
Foundations, footings, slabs, structural concrete.
04Masonry
Brick, block, stone.
05Metals
Structural steel, steel erection, metal fabrications.
06Wood, Plastics & Composites
Rough carpentry / framing, finish carpentry, millwork.
07Thermal & Moisture Protection
Roofing, waterproofing, insulation, siding.
08Openings
Doors, windows, storefronts, hardware.
09Finishes
Drywall, paint, flooring, tile, ceilings.
10Specialties
Signage, partitions, toilet accessories, fireplaces.
11Equipment
Appliances, kitchen equipment, loading dock equipment.
12Furnishings
Cabinets, countertops, window treatments.
13Special Construction
Pools, saunas, pre-engineered structures.
14Conveying Equipment
Elevators, escalators, lifts.
21Fire Suppression
Sprinkler systems, standpipes.
22Plumbing
Water supply, drainage, fixtures, gas piping.
23HVAC
Heating, ventilation, air conditioning, ductwork.
26Electrical
Wiring, panels, lighting, temp power.
27Communications
Low-voltage, data/network cabling, AV.
28Electronic Safety & Security
Alarms, access control, cameras.
31Earthwork
Grading, excavation, shoring (newer-standard alternative to keeping this under 02).
32Exterior Improvements
Paving, landscaping, fencing, site furnishings.
33Utilities
Water, sewer, storm drainage, site electrical/gas distribution.
This is a reference, not a rulebook — pick whichever division numbers make sense for how your team already talks about the job, and stay consistent within a project so the budget-by-cost-code chart stays useful.